New roof installation Ealing covering on a rear extension

New Roofs in Ealing

new roof installation Ealing is a first covering — on a rear extension, a loft, a garage or a new structure — not a strip of an old house roof. J.J Roofing & Construction Ltd installs pitched slate, clay and concrete, plus EPDM, felt and GRP flats, from our Southall base across W5, W13 and W7. We answer 8am–8pm Monday through Saturday; Sunday only if booked. As a result, the figure comes after a survey.

New roof installation Ealing covering on a rear extension
J.J Roofing & Construction Ltd · Southall · Ealing borough
New roof installation Ealing

Pitched or flat, specified to the structure underneath. Written workmanship terms on the install. Not a 24/7 call-out page.

Call 07448 055535 Email a quote pack

First cover

Not a re-strip

Mon–Sat

8am–8pm

Pitched

Slate · clay · concrete

Flat

EPDM · felt · GRP

Build

Loft + extension

What counts as a new covering

Because the carpentry is already there, a new install is the covering that goes on once that structure is ready: an extension roof, a loft that has changed the pitch, a garage, or a porch. However, that is a different job from stripping an existing house. In fact, ranking pages in this borough often blur the two. We keep them apart so Ealing homeowners get the right scaffold, the right membrane and the right conversation with Building Control. Call 07448 055535.

  • New pitched coverings specified to match the host house where the street expects it.
  • New flat systems with designed falls, not a level deck hoping the next storm is kind.
  • Insulation and ventilation discussed on survey, because a new covering is a thermal element.
  • In addition, the same contractor can build the extension or loft that the roof sits on.

Strip-and-replace of an old house covering lives on roof replacement West Ealing. The trade hub is roofing. Combined builds sit on house extensions and loft conversions. Hiring checks sit on top roofer in Ealing.

The install menu

01

Extension roof

First covering on a rear or side addition.

02

Loft roof

New planes, cheeks and junctions after conversion.

03

Pitched

Slate, clay or concrete on a new structure.

04

Flat

EPDM, felt or GRP with designed drainage.

05

Garage / porch

Smaller spans, same discipline on falls.

How an Ealing install is booked

01

Send drawings or photos, postcode and what is being built.

02

We survey the structure and specify pitched or flat.

03

Install, weather the junctions, written workmanship terms.

What this new roof installation Ealing page covers

Ealing’s typical new roof is not a detached new-build on a green field. It is a covering that has to land on an existing Victorian or Edwardian house: a kitchen extension behind a W5 terrace, a hip-to-gable loft on a W13 semi, a garage in Hanwell. Usually, the host building already has a pitch, a verge and often a conservation-sensitive front. Therefore the new work has to weather at every junction, not just look tidy in a photo. Therefore, we quote after we see those junctions. However, we do not sell a borough-wide square-metre rate. Email jjroofingandconstructionltd@gmail.com.

Use the panels for the structure you are covering. Then send the pack so the visit is useful.

Structures we cover on an Ealing install

Rear or side extension

For example, most Ealing extension roofs are low-pitch flats. EPDM, felt and GRP are the three we install. In particular, the abutment with the original wall is where leaks start if the lead or trim is guessed. First, we want the builder’s drawings — or we can be that builder — before we close the covering.

What we need from you: plans if you have them, photos of the host wall, and whether rainwater already has a drain path.

Loft conversion covering

Meanwhile, a loft changes planes: cheeks, a new rear slope, sometimes a hip that becomes a gable. Therefore new tiles or slates have to marry the retained front. Rooflights follow the Planning Portal roof limits if you are using permitted development. We install the covering; we also convert lofts when that is the whole project.

What we need from you: drawings, the proposed material, and whether the front slope must stay as existing.

Pitched on a new structure

Similarly, where the new work is a pitched plane — a side extension with a matching slope, a porch, a larger garage — we install slate, clay or concrete on new battens and breathable underlay. As a result, colour and format follow the host house unless you have consent to change it.

Insulation and ventilation

In addition, a new covering is a thermal element. Consequently Building Regulations expect the install to think about heat loss, not only the finish. Warm-roof build-ups on flats, and ventilation paths on pitched work, are part of the survey conversation. We will not pretend a decorative tile choice is the whole spec.

Quote pack for new roof installation Ealing

Drawings beat guesses. Send what you already have.

  • Postcode (W5, W13, W7 or nearby) and the street
  • What is being covered: extension, loft, garage, porch, or other
  • Plans or a dimensioned sketch, including falls if it is flat
  • Preferred covering if you have one; otherwise say “advise”
  • Whether planning or Building Control is already in play
  • Access width and whether scaffold has been allowed for

Send it now

We specify the covering to the structure. Not a copied brochure.

Email the pack

Call 07448 055535

New covering versus a like-for-like re-cover

In other words, if the house already has a roof and you are taking it off, that is replacement — use the West Ealing replacement URL. Once the carpenter has built something that has never been weathered, that is this page. Mixing the two in one article is how Ealing SERPs ended up with cloned “new roof / replacement / emergency” landings. We keep the install intent here so the specification, the drawings and the Building Control conversation stay honest.

Competitors advertise 10-year and 20-year packages. Those are their terms. Our live site mentions a written workmanship guarantee without a published duration, so this page will not invent one. Ask for the written terms on the quote.

Planning for a new roof on an Ealing house

Specifically, an extension roof is usually wrapped into the householder application for the extension itself. Although a loft that enlarges the roof is Class B territory on the Planning Portal, it is not a simple re-cover. Start with the roof permission guide, then Ealing Council planning and building control. Conservation and Article 4 extra controls are on the council’s conservation areas list. We flag clashes on survey. We do not submit the application unless you appoint us to.

Finally, Building Regulations approval is the other paper. New coverings, insulation and structural change are exactly the work GOV.UK Building Regulations exists for. Height work follows HSE work at height. Trade context: NFRC.

Where we carry out new roof installation Ealing

The install radius is the same 50 miles from Southall. This URL is written for Ealing borough streets, not for a national “surrounding areas” dump.

South Ealing
Ealing Common
Ealing Broadway
Northfields
Hanwell
Perivale
Acton edge
Southall

W5 — Broadway, Common, South Ealing

Initially, W5 extensions sit behind villas and terraces that already have a strong street face. The new covering is almost always at the rear or side. Matching the host eaves line, and getting the abutment right, matters more than a showy front slope that is not being touched.

W13 and W7 — West Ealing, Hanwell, toward Southall

Likewise, West Ealing and Hanwell generate a steady run of kitchen extensions and loft coverings. Southall is our base, so these streets are ordinary working days, 8am–8pm Monday through Saturday. Sunday remains appointment only.

One contractor when the roof sits on a build

Instead, an Ealing homeowner who is already extending or converting should not have to hire a separate roofing firm for the last week of the programme. We already carry out the construction. Independent history is on MyBuilder. Book through contact if you would rather not email the pack.

Frequently asked questions

How much does new roof installation Ealing cost?

There is no published Ealing square-metre menu on our site. Span, covering, insulation, scaffold and whether we are also building the structure all change the figure. You get a written quote after the survey, 8am–8pm Monday through Saturday.

Do I need planning for new roof installation Ealing?

A covering that is part of an extension or loft usually follows that project’s permission. A simple garage re-cover may not. Conservation areas and Article 4 streets need an extra check with Ealing Council. We flag what the visit shows.

Which flat system should I choose?

Felt, EPDM and GRP each have a place. The deck size, upstands, and how you will maintain the roof decide it. We specify after we see the structure, not from a phone call.

Can you build the extension as well as the covering?

Yes. House extensions and loft conversions are already on our service list, so the roof does not have to be a separate contractor at the end of someone else’s build.

Ready to install

Ask for new roof installation Ealing

Send drawings or photos. We survey, then we specify pitched or flat. Written workmanship terms follow the install.

07448 055535 Contact Email

Southall yard. Weekdays and Saturday 8am–8pm; Sunday only if booked. Homepage

Scroll to Top